Application procedure
Shake the bottle thoroughly to mix the nano-carbon content.
Apply several drops to a suede applicator cloth on a coating block.
Spread in straight lines only, overlapping slightly. Avoid circular or cross-hatch motion.
Work in small sections (~60×60 cm / 2×2 ft) to maintain control and consistency.
Wipe off immediately—do not wait for rainbowing or flashing. Use a 2-towel method:
First towel: gentle, slow wipe to remove ~80% of residue.
Second towel: final buff to refine finish and catch any high spots.
Inspect under light for smears or dark patches—rebuff or reapply if needed.
Only 1 coat is needed. For layering with Miyabi: apply Miyabi, wait 1–2 hrs, then ISM 3.0.
Allow 12 hours cure time, and keep the surface dry for 24 hours minimum.
Avoid washing for 7 days to ensure full curing.
For faster curing, IR lamp at 70–75 °C for 10–15 min per panel is optional.